IEC 62616 FREE DOWNLOAD

Set the dormant period Td to 3 min and initiate the equipment and allow the equipment to produce the third stage alarm. First stage bridge audible alarm The first stage audible alarm which sounds on the bridge at the end of the visual indication period shall have its own characteristic tone or modulation intended to alert, but not to startle, the 00W. Publication IEC Year — Title Maritime navigation and radiocommunication equipment and systems — General requirements — Methods of testing and required test results Maritime navigation and radiocommunication equipment and systems – Digital interfaces Maritime navigation and radiocommunication equipment and systems — Digital interfaces — Part 1: Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. Check that a visual indication is produced after a period of 3 min. Check documented evidence for any facilities provided to check malfunction of the equipment such as time clock errors, serial interface errors, lack of continuity through remote alarms, reset devices, battery failure etc.

iec 62616

Uploader: Vubar
Date Added: 23 January 2017
File Size: 66.55 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 24563
Price: Free* [*Free Regsitration Required]

iec 62616

Installation set-up facilities shall be provided to inhibit the third stage alarm and to increase the delay between the second and third stage alarms to 3 min. For dated references, only the ifc cited applies. Confirm by inspection of documented evidence that input ports are available for connection of external reset devices from other equipment capable of registering physical activity and mental alertness of the OOW for example motion detectors.

Set the dormant period Td to 3 min and initiate the equipment and allow the equipment to produce a visual indication.

The visual indication initiated at the end of the dormant period shall take the form of a flashing indication. The sound pressure level 1 m from the source shall be at least 75 dB A but not greater than 85 dB A. The required result is that the BNWAS correctly produces the first stage bridge audible alarm and then resets.

  ADIEMUS IV THE ETERNAL KNOT DOWNLOAD FREE

The malfunction indication, and all elements of the Emergency Call facility, if incorporated, shall be powered from a battery maintained supply. After a period of 2 min reset the equipment.

iec 62616

Reset the equipment to cancel this indication. Additionally, inputs shall be available for operating the emergency call system as described in 3. The operational mode of the equipment shall be indicated to the OOW. This should include the status of all mandatory alarms on the bridge.

The unacknowledged alarm should ief visible and audible.

IEC 62616 – System Ergonomy

Means of activating the reset function shall be easily accessible from the conning position, the workstation for navigating and manoeuvring, the workstation for monitoring and the bridge wings. If the second stage audible alarm is sounded in this way, the third stage alarm may ief omitted. First stage bridge audible alarm The first stage audible alarm which sounds on the bridge at the end of the visual indication period shall have its own characteristic tone or modulation intended to alert, but not to startle, the 00W.

Diese Norm steht nicht in unmittelbarem Zusammenhang mit Rechtsvorschriften und ist nicht als Sicherheitsnorm anzusehen. This purpose is achieved by a series of indications and alarms to alert first the OOW and, if he is not responding, then to alert the Master or another qualified OOW.

For the purposes of IEC the following definitions apply: Single operator action is defined as 6266 a hard-key or soft-key including any necessary cursor movement. The volume of this alarm shall be sufficient for it to be heard throughout the locations above and to wake sleeping persons as described in IMO resolution A. NOTE See also 5.

  DOWNLOAD WIL MIMNAUGH ROAM

IEC /COR | IEC Webstore

The BWNAS shall be installed in the test facility using interconnection and input cabling and methods representative of a normal installation. The volume of this alarm shall be sufficient for it to be heard throughout the locations above and to wake sleeping persons as described in IMO resolution A. If the reset function is activated before the end of the dormant period, the period shall be re-initiated to run for its full duration from the time of the reset.

Nationales Vorwort Vorausgegangener Norm-Entwurf: The first stage audible alarm which sounds on the bridge at the end of the visual indication period shall have its own characteristic tone or modulation intended to alert, but not to startle, the 00W.

IEC | IEC Webstore

NOTE Bridge includes wheelhouse and bridge wings. Check that a visual indication is produced after a period of 3 min. Check documented evidence for any facilities provided to check malfunction of the equipment such as time clock errors, serial interface errors, lack 6261 continuity through remote alarms, reset devices, battery failure etc.

iec 62616

Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. For undated references, the latest edition of the referenced document including any amendments applies. Manual reset devices shall all be of a uniform design and shall jec illuminated for identification at night.

Zu diesem Zeitpunkt wird entsprechend der Entscheidung des Komitees die Publikation — best? Presentation of information Operational mode The operational mode of the equipment shall be indicated to the OOW.